history

1972

  • Founded as Yung-Fu Plastic Factory in Sanchong, Taipei County, TAIWAN.

1975

  • Renamed as Cheng Fa Plastic Factory with registration capital NTD 3,000,000

1980

  • Renamed as Cheng Fa Plastic Manufacturing Co. Ltd. with registration capital NTD 25,000,000

1982

  • Relocated to Guishan Township, Taoyuan County.

1984

  • UL certified. Assigned Code: A1180.

1987

  • Established Auto Loading System.

1988

  • Expanded the warehouse and purchased the Ultra-Sonic Welding Machines.

1991

  • Passed the assessment of Industrial Corporation by Industrial Development Bureau, Ministry of Economic Affairs and Corporate Synergy Development Center.

1996

  • Implemented the MIS system.

1997

  • Installed Gas-Assist Injection Molding Devices.

1998

  • ISO9002 certified by RW TÜV.
  • Installed Spin Welding Machine from Japan.

1999

  • Establish the EDI management system.

2001

  • Installed another new Gas-Assist Injection Molding Devices.
  • Established ERP management system.

2003

  • ISO9000 certifies by RW TÜV.

2004

  • Purchased a new 800-ton Injection Molding Machine.
  • Installed the third Gas-Assist Injection Molding Devices.

2005

  • Adopted RoHS system.

2010

  • Installed two sets of Rapid Heat Cycle Molding (RHCM) devices.

2012

  • Purchased new 300-ton and 150-ton Injection Molding Machines.
  • ISO9001:2008 certified by RW TÜV.

WE MOLD YOUR CREATIV DESIGN INTO FANTASTIC PRODUCTS!